PLAN

Architecture, Compliance, and a Roadmap With Dates

Plan turns the scope into engineering decisions you approve: integrations, data flows, security model, and a phased roadmap with dates and fixed pricing.

Phase 02 of 05 Named owner on your side Gate with defined outputs
1-2 wks Typical phase length
1 Named owner from your team
100% Outputs documented
0 Surprises at the gate

What Happens in Plan

The phase in one sentence, then the mechanics.

Planning is where healthcare software projects earn or lose their money, because integration and compliance decisions are cheap on a whiteboard and ruinous in production. This phase produces the architecture: which systems talk, through which interfaces, with which data flowing where, under which access rules. The compliance model gets designed with your obligations in view, including BAA coverage, audit logging, and PHI handling boundaries. Then the roadmap assembles it into phases with dates, owners, and fixed pricing per phase, so you approve numbers you can actually hold. Nothing gets built in the next phase that was not described and priced in this one, which is precisely why surprises do not survive to launch.

Integration architecture approved. <div> Every system connection is designed and documented before feature code exists.

Compliance model designed. <div> Access roles, audit logging, encryption, and BAA coverage are decided here, not patched later.

Data flows mapped. <div> Where patient data travels, who touches it, and what gets logged is written and reviewed.

Roadmap with dates. <div> Phases, milestones, and owners are scheduled, and slippage gets surfaced early by design.

Fixed pricing per phase. <div> You approve phase-level numbers, so the budget conversation happens once, calmly.

What This Phase Produces

Concrete outputs you will see, not abstract promises.

Integration Design

API, interface, and workflow connections designed and validated as feasible before build depends on them.

Security and Compliance Model

Access control, encryption, audit logging, and BAA structure designed with your counsel in the loop.

Data Flow Mapping

Every read and write of patient data mapped, so nothing about PHI is discovered accidentally in production.

Roadmap and Milestones

Phase plan with dates, deliverables, and named owners on both sides, signed with the pricing.

Success Metrics Defined

The baseline numbers from Discover become the targets each phase is measured against.

Communication Plan

Touchpoints, demos, and escalation paths agreed, so nobody wonders about status mid-build.

The Phase Step by Step

How the weeks actually spend themselves inside this phase.

01

Architecture sessions

Integration and data design sessions with your technical contacts and vendors where needed.

02

Compliance review

The security model walks through your obligations and counsel notes, and revisions happen here.

03

Roadmap assembly

Phases, dates, owners, and pricing per phase assembled into the roadmap document.

04

Plan gate

Architecture and roadmap approved and signed, and Build begins against a fixed target.

Frequently Asked Questions

Straight answers for practice owners evaluating software planning.

Who should join planning sessions from our side?

Your operational owner, whoever manages your EHR or PMS, and your compliance or legal contact for the security model. Three people, one week, and the decisions stick.

Do we need vendor cooperation for integrations?

Sometimes, and we handle the requests. Where vendors are slow, the roadmap sequences alternatives, because waiting on a third party is a plan, not an excuse.

What exactly is fixed in the pricing?

Each phase carries a fixed price against its written deliverables. Scope changes are priced as change orders at sprint boundaries, so you never discover a cost retroactively.

Can the plan change later?

At sprint boundaries, yes, with pricing adjusted transparently. What cannot happen quietly is drift: every change is named, priced, and approved.